Industrial / Oil & Gas Sector

INDUSTRIAL/OIL & GAS SECTOR

CAPUA 1880

ESSENTIAL OILS MANUFACTURER

LOCATION: Reggio Calabria

YEAR: 2015

PROJECT: Design, manufacture, and installation of an Aquatech® Plus lowpressure water mist system.

TRONCHETTI SPA

PAPERMILL

LOCATION: Lucca

YEAR: 2019

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

CO.TA.FAR.TI

PHARMACEUTICALS WAREHOUSE

LOCATION: Taranto

YEAR: 2014

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

GENERAL TRADE SPA

TOY WAREHOUSE

LOCATION: Taranto

YEAR: 2006

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

HEINEKEN

BEER PRODUCTION PLANT

LOCATION: Taranto

YEAR: 2022

PROJECT: Design, production and installation of new pumping unit

ILVA CONVEYOR BELTS

CLIENT: ILVA SpA – ARCELOR MITTAL ITALIA SPA

LOCATION: Taranto

YEAR: 2015-2022

PROJECT: Design of a low-pressure water mist system, with the fire extinguishing agent FireFive® (additive), designed according to UNI EN14972.

MINERAL PARKS COVERAGE ACCIAIERIE D'ITALIA

CLIENT: CIMOLAI SPA, SEMAT SPA

LOCATION: Taranto

YEAR: 2018 (MINERAL PARK), 2021 (FOSSIL PARK), 2022 (OMO FOSSIL PARK)

PROJECT: Integrated mineral park roofing project. Design, supply, installation and testing of integrated fire protection systems for bivalent machines consisting of automatic fire detection system using optical fiber; aquatech® plus water mist attached fire extinguishing system. Construction of fire-fighting water network perimeter to the roof.

PROTECTION OF CABLE TUNNELS AND CABINS

CLIENT: ILVA SpA

LOCATION: Taranto

YEAR: 2015

TIPOLOGIA DI LAVORO: Design, construction and installation of new fire-fighting systems serving the new “XXI UNIT A” industrial technical gas production plant (oxygen, nitrogen and argon) consisting of: – Fixed automatic Water Mist extinguishing systems for the cable tunnel and low voltage electrical substations; – Hydrant network extinguishing plant ; – Fixed automatic inert gas detection plants.

TARANTO JETTY REFINERY

CLIENT: ENI SpA

LOCATION: Reggio Calabria

YEAR: In progress

PROJECT: Design, production and installation of a waterfoam fire-fighting system to protect platforms P1, P2 and B5

FIRE ALARM REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: 2014

PROJECT: Design, production, installation and maintenance of the new integrated and modular Fire Alarm system serving the entire Refinery.

OFF-SHORE PLATFORM

CLIENT: Adriatic LNG

LOCATION: Alto Mar Adriatico

YEAR: 2020

PROJECT: Five-year maintenance contract for fire protection systems

VENICE REFINERY

CLIENT: Eni SpA – DIV. R&M

LOCATION: Porto Margherita

YEAR: 2018

PROJECT: Firefighting systems maintenance

TARANTO REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: IN progress

PROJECT: Firefighting system maintenance

RAVENNA PETROCHEMICAL SITE

CLIENT: ENI VERSALIS

LOCATION: Ravenna

YEAR: 2020

PROJECT: Design and supply of foam fire suppression system for ravenna plant, island 20: protection of containment basins for flammable liquids d01, d02,d04, d05, d07, d08, d09, ed13.

CORLETO PERTICARA REFINERY

CLIENT: TotalEnergies

LOCATION: Corleto Perticara

YEAR: In progress

PROJECT: Firefighting system maintenance

SANNAZZARO REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: 2015 – 2018

PROJECT: Firefighting system maintenance

ALGERIA REFINERY

CLIENT: ABB SPA FOR SONATRACH

LOCATION: Algeria

YEAR: 2018

PROJECT: Design, manufacture and supply of water mist fire protection systems for the protection of 200 LPG TRAINS. (revamping)

RUSSIA REFINERY

CLIENT: GAZPROMNEFT

LOCATION: Moscow Refinery

YEAR: 2015

PROJECT: Supply of vertical foam proportioners systems

EGYPT REFINERY

CLIENT: AGIP PETROLEUM CO SAE

LOCATION: Egypt

YEAR: 2010

PROJECT: Design, manufacture and installation of water and foam firefighting systems.

NIGERIA REFINERY

CLIENT: NIGERIAN AGIP OIL COMPANY

LOCATION: Port Harcourt

YEAR: 2010

PROJECT: Design and supply of on-shore and off-shore gas fire protection systems

IRAN REFINERY

CLIENT: LORESTAN

LOCATION: Iran

YEAR: 2014

PROJECT: Design and supply of fire&gas systems

ALGERIA REFINERY

CLIENT: SONATRACH

LOCATION: Algeria

YEAR: 2012

PROJECT: Supply of pumping units

KAZAKHSTAN REFINERY

CLIENT: YUZHPROMSNAB

LOCATION: KAZAKHSTAN

YEAR: 2014

PROJECT: Supply of vertical foam proportioners systems

RUSSIA REFINERY

CLIENT: ROSNEFT

LOCATION: OVOKUIBYSHEVSK

YEAR: 2015

PROJECT: Supply of vertical foam proportioners systems

HYDROELECTRIC POWER PLANT

CLIENT: ENEL GREEN POWER SPA

LOCATION: Varie

YEAR: 2021

PROJECT: Maintenance of Fire Protection Systems and Devices. Bologna, Parma, Soverzene, Feltre, Presenzano, Acri, Catania, North Area and Northwest Area lots.

NUCLEAR POWER PLANT

CLIENT: SLOVENSKÉ ELEKTRÁRNE

LOCATION: SLOVACCHIA

YEAR: In progress

PROJECT: Supervision of the design of all fire protection systems to protect the plant.

POWER PLANT

CLIENT: ENEL SPA

LOCATION: Varie

YEAR: 2018

PROJECT: Design, manufacture and supply of water mist / chemical gas and fire&gas detection systems – supply for enclosure and turbopumps gr. 1/2/3/4

INDUSTRIAL /
OIL & GAS SECTOR

CAPUA 1880

ESSENTIAL OILS MANUFACTURER

LOCATION: Reggio Calabria

YEAR: 2015

PROJECT: Design, manufacture, and installation of an Aquatech® Plus lowpressure water mist system.

TRONCHETTI SPA

PAPERMILL

LOCATION: Lucca

YEAR: 2019

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

CO.TA.FAR.TI

PHARMACEUTICALS WAREHOUSE

LOCATION: Taranto

YEAR: 2014

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

GENERAL TRADE SPA

TOY WAREHOUSE

LOCATION: Taranto

YEAR: 2006

PROJECT: Design, manufacture and installation of an Aquatech® high-pressure water mist system

HEINEKEN

BEER PRODUCTION PLANT

LOCATION: Taranto

YEAR: 2022

PROJECT: Design, production and installation of new pumping unit

ILVA CONVEYOR BELTS

CLIENT: ILVA SpA – ARCELOR MITTAL ITALIA SPA

LOCATION: Taranto

YEAR: 2015-2022

PROJECT: Design of a low-pressure water mist system, with the fire extinguishing agent FireFive® (additive), designed according to UNI EN14972.

MINERAL PARKS COVERAGE ACCIAIERIE D'ITALIA

CLIENT: CIMOLAI SPA, SEMAT SPA

LOCATION: Taranto

YEAR: 2018 (MINERAL PARK), 2021 (FOSSIL PARK), 2022 (OMO FOSSIL PARK)

PROJECT: Integrated mineral park roofing project. Design, supply, installation and testing of integrated fire protection systems for bivalent machines consisting of automatic fire detection system using optical fiber; aquatech® plus water mist attached fire extinguishing system. Construction of fire-fighting water network perimeter to the roof.

PROTECTION OF CABLE TUNNELS AND CABINS

CLIENT: ILVA SpA

LOCATION: Taranto

YEAR: 2015

TIPOLOGIA DI LAVORO: Design, construction and installation of new fire-fighting systems serving the new “XXI UNIT A” industrial technical gas production plant (oxygen, nitrogen and argon) consisting of: – Fixed automatic Water Mist extinguishing systems for the cable tunnel and low voltage electrical substations; – Hydrant network extinguishing plant ; – Fixed automatic inert gas detection plants.

TARANTO JETTY REFINERY

CLIENT: ENI SpA

LOCATION: Reggio Calabria

YEAR: In progress

PROJECT: Design, production and installation of a waterfoam fire-fighting system to protect platforms P1, P2 and B5

FIRE ALARM REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: 2014

PROJECT: Design, production, installation and maintenance of the new integrated and modular Fire Alarm system serving the entire Refinery.

OFF-SHORE PLATFORM

CLIENT: Adriatic LNG

LOCATION: Alto Mar Adriatico

YEAR: 2020

PROJECT: Five-year maintenance contract for fire protection systems

VENICE REFINERY

CLIENT: Eni SpA – DIV. R&M

LOCATION: Porto Margherita

YEAR: 2018

PROJECT: Firefighting systems maintenance

TARANTO REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: IN progress

PROJECT: Firefighting system maintenance

RAVENNA REFINERY

CLIENT: ENI VERSALIS

LOCATION: Ravenna

YEAR: 2020

PROJECT: Design and supply of foam fire suppression system for ravenna plant, island 20: protection of containment basins for flammable liquids d01, d02,d04, d05, d07, d08, d09, ed13.

CORLETO PERTICARA REFINERY

CLIENT: TotalEnergies

LOCATION: Corleto Perticara

YEAR: In progress

PROJECT: Firefighting system maintenance

SANNAZZARO REFINERY

CLIENT: ENI SpA

LOCATION: Taranto

YEAR: 2015 – 2018

PROJECT: Firefighting system maintenance

ALGERIA REFINERY

CLIENT: ABB SPA FOR SONATRACH

LOCATION: Algeria

YEAR: 2018

PROJECT: Design, manufacture and supply of water mist fire protection systems for the protection of 200 LPG TRAINS. (revamping)

RUSSIA REFINERY

CLIENT: GAZPROMNEFT

LOCATION: Moscow Refinery

YEAR: 2015

PROJECT: Supply of vertical foam proportioners systems

EGYPT REFINERY

CLIENT: AGIP PETROLEUM CO SAE

LOCATION: Egypt

YEAR: 2010

PROJECT: Design, manufacture and installation of water and foam firefighting systems.

NIGERIA REFINERY

CLIENT: NIGERIAN AGIP OIL COMPANY

LOCATION: Port Harcourt

YEAR: 2010

PROJECT: Design and supply of on-shore and off-shore gas fire protection systems

IRAN REFINERY

CLIENT: LORESTAN

LOCATION: Iran

YEAR: 2014

PROJECT: Design and supply of fire&gas systems

ALGERIA REFINERY

CLIENT: SONATRACH

LOCATION: Algeria

YEAR: 2012

PROJECT: Supply of pumping units

KAZAKHSTAN REFINERY

CLIENT: YUZHPROMSNAB

LOCATION: KAZAKHSTAN

YEAR: 2014

PROJECT: Supply of vertical foam proportioners systems

RUSSIA REFINERY

CLIENT: ROSNEFT

LOCATION: OVOKUIBYSHEVSK

YEAR: 2015

PROJECT: Supply of vertical foam proportioners systems

HYDROELECTRIC POWER PLANT

CLIENT: ENEL GREEN POWER SPA

LOCATION: Varie

YEAR: 2021

PROJECT: Maintenance of Fire Protection Systems and Devices. Bologna, Parma, Soverzene, Feltre, Presenzano, Acri, Catania, North Area and Northwest Area lots.

NUCLEAR POWER PLANT

CLIENT: SLOVENSKÉ ELEKTRÁRNE

LOCATION: SLOVACCHIA

YEAR: In progress

PROJECT: Supervision of the design of all fire protection systems to protect the plant.

POWER PLANT

CLIENT: ENEL SPA

LOCATION: Varie

YEAR: 2018

PROJECT: Design, manufacture and supply of water mist / chemical gas and fire&gas detection systems – supply for enclosure and turbopumps gr. 1/2/3/4